After 3+ months of construction, the Golden Bear Physical Therapy project is complete and has opened its doors!
Project Description
This 3,300 SF project included a complete therapy pool, four treatment rooms, a large main therapy room, break room, charting room and two large locker rooms.
The biggest project challenge by far was installing a swimming pool in an existing building. This required removing sections of the exterior windows and some deft Bobcat driving by the pool installer.
Click here to see the before pictures for this project.
The Results
Here are a few of our favorite pictures of the results:
The Team
This project would not have been possible without the incredible team of subcontractors and suppliers. Here is the all-star lineup:
- API, Inc., Modesto (Design)
- JSO Construction, Modesto (Finish Carpentry and Misc. Repair)
- Floors Plus, Modesto (Flooring)
- Nor Cal Concrete, Modesto (Concrete)
- A-1 Glass, Modesto (Storefront)
- Hogan Drywall, Ripon (Drywall and Metal Studs)
- Cal West Concrete Cutting, Manteca (Sawcut)
- Acosta & Sons, Hickman (Cabinets)
- Sacramento Building Products, Sacramento (Insulation)
- Morris Supply, Modesto (Doors, Frames and Hardware)
- Schneider Acoustic Specialties, Modesto (T-bar and Paint)
- McBay Tile, Modesto (Tile and Granite)
- Cen-Cal Fire Systems, Lodi (Fire Sprinklers)
- DeHart Plumbing, Heating and Air, Modesto (Plumbing)
- Dycus Heating and Air, Modesto (HVAC)
- BC Electric, Modesto (Electrical)